Where charging has to work

Charging solutions for situations where conventional models don’t work

EV Mobile’s solutions are designed for sites where electric mobility is already a daily reality, but grid capacity, peak use or investment cost limits what can be delivered.

We don’t start from a category of use case. We start from the actual situation where charging has to work immediately.

How we approach it

The need defines the solution, not the application

EV Mobile designs each setup around how charging is used, when the load peaks and what is critical for the operation right now. The outlook for growth is taken into account at the same time.

One thing is common to every application: charging has to work immediately, even when the grid is not yet flexible.

Fleet and schedule

Logistics and heavy transport

Charging is not a convenience. It is a precondition for the operation and part of the schedule. When a vehicle stops to unload or load, charging has to happen inside that window, reliably and often for several vehicles at once.

The solution supports high fleet utilization without charging dictating the timetable.

Public sector

Municipalities, destinations and service areas

For municipalities, charging is part of accessibility, vitality and climate targets. The need already exists, but capacity, investment decisions and schedules move at different speeds. The solution allows a controlled start and development in stages, with no heavy investment. At destinations and service areas, charging demand concentrates into seasons and passing traffic. Fast charging has to be available exactly at the peak, but sizing capacity for a handful of peaks makes no sense. The solution supports visitor flow and the appeal of the area without over-sizing.

Property and site

Retail, parking, construction and temporary sites

In retail and parking, customers stay for a limited time and charging has to deliver something real within the visit. At the same time, the property’s other electricity use limits available charging power. Battery buffering separates customer charging from the property’s momentary capacity.

At some sites there is no grid connection at all, or it is insufficient. On construction sites, at events and in productions, power and charging have to be available immediately, often temporarily and in changing conditions. The solution delivers power quickly, with no permanent infrastructure.

01

Charging happens unevenly, and at critical moments

02

Battery buffering is at the core of the solution

03

Sizing follows actual use

04

A service model without over-sizing or unnecessary risk

What it delivers

One approach, five kinds of site

What the applications have in common is that charging is needed before the infrastructure is ready.

X

Sites in service

Y

Weeks from decision to charging

€0

Capital investment

Tell us where charging needs to work. Describe the site briefly and how it will be used, and we will work out what kind of solution fits and on what timeline.

The assessment is free and commits you to nothing.

Looking for a partner who understands your situation?